Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Happy 58th birthday, Chevrolet Corvette

Thu, 30 Jun 2011

Fifty-eight years ago, on June 30, 1953, the first production Chevrolet Corvette rolled off the temporary assembly line in Flint, Mich. This was just six months after the Corvette made its world debut at the 1953 GM Motorama at the Waldorf-Astoria Hotel in New York City. The Flint line would build 300 copies of the '53 Corvette--all of them white, with red interiors and black folding tops.

MINI Cooper All4 Hybrid Spied

Tue, 29 Mar 2011

A MINI Cooper All4 Hybrid - complete with 'Hybrid Test Car' sticker What? You thought MINI had come up with every possible permutation of bodyshape, drivetrain and powerplant? Don’t be silly; not by a long way.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.